Sembcorp Marine Pandan Yard
A facility located in the west of Singapore optimised for the construction of jack-up rigs, particularly the globally recognised and proven Pacific Class jack-up drilling rigs.
The 14.2-hectare Sembcorp Marine Pandan Yard is able to accommodate the construction of seven proprietary design Pacific Class 400 jack-up rigs at various stages of construction at any one time. The location’s capacities are optimised to fabricate jack-up rigs with maximum efficiency and equipped with three specially configured launchways and customised facilities for the fabrication of jack-up leg sections.
FACILITY HIGHLIGHTS | |
---|---|
Wharf | 235m with 25m extension |
Sea Frontage | 700m |
Launchways | 3 |
Painting/Blasting enclosures | 2 x (25m x 14m x 30m) 2 x (25m x 10m x 30m) |
Custom-built blasting and painting enclosures for leg sections | 4 x (15m triangular x 12m height) |
Crane Facilities | 13 (Crawler, Crawler Ringer, Platform ringer cranes ranging from 50-750 tonnes) |
Wharf draft @ Zero tide | 6m |